Elblag & Elblag CanalUnique Canal Construction in Poland. The difference in water levels approaches
100 m, and is overcome using locks and a remarkable system of tracks between
lakes. The travel on the canal ship lasted about 5 hours including over 2 hours
through the lake. It was long but the views were great indeed! Aleksandra Blalteberg, Gdynia, Poland Municipal office in Elblag: http://www.umelblag.pl/en/
|